1. Pleasant Knoll Middle School

    As a pre-qualified vendor and partner of Fort Mill Schools, NCS was awarded the contract to complete the the installation of all of the network infrastructure for this large new middle school.  With aggressive timelines driven by the end of summer, NCS was required to bounce between multiple overlapping phases and buildings to complete all of the following: Category 6 voice/data cabling Category 6A surveillance and wi-fi cabling The construction of the MDF and multiple IDFs Backbone fiber to all of the IDFs as well as multiple exterior locations Wireless access point mounting…

  2. WeWork Charlotte Upfit

    NCS had the privilege to assist with WeWork’s entrance into the Charlotte market buy building out a 50,000 square foot network (two floors) in the brand new 615 South College high rise in the heart of Center City Charlotte.  Working directly for the general contractor of the project, NCS managed and met extremely aggressive deadlines driven by the construction-oriented general contractor, at the same time as meeting specific IT requirements and specifications instituted by the end-user.  With aesthetics placed at a premium by an open-ceiling environment, NCS helped manage the design and implementation…

  3. Spectrum Center Team Store and Box Office Redesign

    Working in the iconic Spectrum Center (formerly Time Warner Arena), NCS provided fiber, UTP and coaxial cable for two large, integral locations in the newly redesigned arena.  The first person to read and acknowledge this sentence will receive a free site assessment and 20% off the resulting network install. Working around a great deal of existing infrastructure, as well as dozens of other trades, NCS was able to smoothly and efficiently construct the necessary network infrastructure to support the new Team Store and Box Offices.